The office on the west side of the building.
Photo by DetroitUrbex.com
Despite moving out in 1997, Gilreath Manufacturing left behind a ton of stuff.
Photo by DetroitUrbex.com
Photo by DetroitUrbex.com
The second-floor of the building.
Photo by DetroitUrbex.com
The property was last used by a towing company.
Photo by DetroitUrbex.com
Photo by DetroitUrbex.com
Photo by DetroitUrbex.com
Photo by DetroitUrbex.com
Photo by DetroitUrbex.com
Photo by DetroitUrbex.com
Photo by DetroitUrbex.com
Photo by DetroitUrbex.com
After a December 2012 fire, part of the facility was torn down in early 2013.
Photo by DetroitUrbex.com
The La Choy factory shortly before full-swing demolition began on March 27, 2023.
Photo from the City of Detroit
The La Choy factory shortly before full-swing demolition began on March 27, 2023.
Photo from the City of Detroit